Still visible after fifty washes, or it is not PPE
Safety Wear & PPE
A high-visibility garment that stops being high-visibility is worse than no garment at all, because somebody is relying on it. We stitch reflective tape down both edges rather than only heat-setting it, and we specify tape by its rating rather than by how bright it looks on the roll.
- Type
- Woven
- Minimum order
- Depends on the route
- Lead time
- 7 – 10 days
- Colourways
- 8+ stock colours





Hi-vis vests, coveralls and boiler suits, two-piece sets and reflective jackets, specified for the hazard rather than for the price. Mining, energy, construction, ports and logistics each get a different fabric weight and a different tape configuration.
Tape goes on in the layout your safety officer signs off — H-pattern, twin band or shoulder braces — and is stitched, not glued. Company marks are embroidered or applied as heavy-duty transfer that will not lift a corner in the heat.
PPE is a compliance purchase, so the paperwork matters as much as the garment. Fabric and tape specifications are supplied with every delivery and kept on file, which is what makes a repeat order verifiably the same product rather than a similar one.
Specification
- Garments
- Hi-vis vests, coveralls, boiler suits, two-piece sets, reflective jackets
- Fabric
- Cotton drill, poly-cotton drill, hi-vis polyester
- Weight
- 220 – 320 GSM
- Reflective tape
- Stitched both edges. H-pattern, twin band or shoulder braces
- Reinforcement
- Bar-tacked stress points, reinforced knees and elbows
- Documentation
- Fabric and tape specifications supplied with every delivery
- Sizes
- S – 5XL, tall options available
Build your spec
Pick colourways and sizes — we'll carry it into your quote.
Colourways
1 of 8 selected
Navy
Size breakdown
Steppers move in sixes — garments are packed and priced by the dozen.
Navy
Illustration, not a photograph
Ordering routes
- Custom design on stock fabric7 – 10 days
- Custom fabric or colourQuoted per job
Add quantities and we will show you which routes are open.
Nothing is ordered yet. How ordering works
Custom colours dyed to your Pantone reference at production quantities. Colour is confirmed at sampling stage.
How to order safety & ppe.
The minimum and the lead time both depend on the route. Pick the row that matches your brief.
Custom design on stock fabric
- Minimum
- Low
- Lead time
- 7 – 10 days
Your own design, cut from fabric we already hold. Same low quantity barrier, a little longer to make.
Custom fabric or colour
- Minimum
- 2,000 pieces
- Lead time
- Quoted per job
We source the fabric, trims and accessories for you. That is a production run of its own, which is where the 2,000 piece minimum comes from.
Woven, not knitted
This garment is woven. Fabric is sourced per order to the weight and colour the job needs, so it is specified and quoted with the enquiry rather than picked off a list.
Decoration options
- Embroidery
- Heavy-duty transfer
- Reflective tape configurations
- Name and role badges
- DTF
All decoration is done in house, which is why a printed or embroidered garment does not add a week to your lead time.
Typically ordered by
- Mining and quarrying
- Oil, gas and energy
- Construction and civils
- Ports and logistics
- Utilities and roadworks
Related families
What buyers ask
about safety & ppe.
There is no single number, because it depends on the fabric. If we are cutting from fabric and a colour we already hold, the minimum is low and the job moves in two to three days. If you want your own design on that stock fabric, the minimum is still low and it takes seven to ten days. It is only when we source fabric, trims and accessories specially for you that the minimum becomes 2,000 pieces, because that is a production run of its own. Sublimation has no minimum at all.
No. A couple of hundred is a normal order on stock fabric, and most of our work looks like that. The 2,000 piece figure people worry about applies only to custom fabric or a custom colour, where we are buying in material specially. Tell us the quantity and the look you want and we will tell you which route it fits.
Two to three days on stock fabric in a stock colour. Seven to ten days for your own design cut from that stock fabric. Where we are sourcing fabric or a custom colour, the lead time is quoted with the job, because it depends on what the material is and where it comes from. Sublimation is also quoted per job.
Screen printing, embroidery, DTF (direct to film) and sublimation, all in the same building as the cutting and sewing. That matters for your lead time, because a decorated garment never has to travel out to a third party and back. You can mix methods on one garment: an embroidered chest mark with a printed back is a common and sensible combination.
Yes, and this is one of the cases where we are sourcing fabric specially, so the 2,000 piece minimum applies. We match against your Pantone or brand guideline references and record them against your account, so a repeat order in a year is built from the same inputs. Exact dye matching is confirmed at sampling stage.
None. You can order one piece or a thousand. What changes with quantity is the unit price, not whether we will take the job. Sublimation suits full-colour designs, marathon and sports jerseys, and anything where the print covers the whole garment.
Quote safety wear & ppe
Ready to price
your run?
Tell us the quantity, the colourways and the decoration and we will come back with a unit price and a lead time. There is no single minimum — it depends on whether we are cutting stock fabric or sourcing new fabric for you.
Or call +255 651 100 500 · Monday – Friday, 08:00 – 17:00 EAT


